Regular Member Meeting 2017 02 14: Difference between revisions
From HacDC Wiki
(→New Business: asdf) |
(→Project CRISPR: asdf) |
||
Line 40: | Line 40: | ||
=== Project CRISPR === | === Project CRISPR === | ||
We repeated the experiment last week with new materials, unfortunately with mixed results, i.e. the CRISPR sample worked, but the control also worked. So there may be a problem with the Strep-Kan plates or new bacteria strain L21. I suppose it should be done again with both L21 and HME63 strains | We repeated the experiment last week with new materials, unfortunately with mixed results, i.e. the CRISPR sample worked, but the control also worked. So there may be a problem with the Strep-Kan plates or new bacteria strain L21. I suppose it should be done again with both L21 and HME63 strains but maybe someone other than me should go through it this time. - Enrique | ||
=== Project SpaceBlimp === | === Project SpaceBlimp === |
Revision as of 04:50, 14 February 2017
Time and Location
- Date: February 14, 2017
- Called to order at xxxx pm by xxxx
- Members present:
- Members remote:
- Others present:
- Quorum
- Quorum met?
Approval of Previous Meeting's Minutes
http://wiki.hacdc.org/index.php/Regular_Member_Meeting_2017_01_10
Recognition
- We had an annual meeting, so welcome to our two new board members: Ben and Kevin.
- Ben put up some more classroom decor.
- Julia (et al?) got the Lulzbot printing rubber parts.
New Members
Old Business
- Bylaws amendment proposal (unless it was already voted on?): Change the threshold for future bylaws amendments from "more than three quarters (3/4ths) of voting members," to "more than three quarters (3/4ths) of member votes cast 90 days from the proposal approval date," and from "Notice of such petition must be submitted electronically to all members," to "Notice of such a petition must be submitted to all members electronically and, where electronic means produce no response, all other available means." (Explanation: We are dangerously close to having 1/4th of members not respond aye/nay and making amendments impossible) - Enrique
New Business
- There's been some discussion of changing or frequently rotating door key-codes since the church was robbed last week; we would prefer some kind of RFID thing... discussions ongoing I guess.
Project Awesome Reports
Project SUPPLIES
Project EXPANSION
Project HAMRADIO
Project Electron Microscope (SEM)
We received the new vacuum gauge; it did not include the power adatper. It's a simple part: DC power supply 2W between 9 and 30V connected to an HD15 (VGA) conncetor. It's an easy job but someone's gotta do it. - Enrique
Project Optical Table Robot (OTR)
Project CRISPR
We repeated the experiment last week with new materials, unfortunately with mixed results, i.e. the CRISPR sample worked, but the control also worked. So there may be a problem with the Strep-Kan plates or new bacteria strain L21. I suppose it should be done again with both L21 and HME63 strains but maybe someone other than me should go through it this time. - Enrique
Project SpaceBlimp
Dirk & Sam finished the video! https://www.youtube.com/watch?v=JhjD4Q3JfMM -Enrique
Member Reports
- Enrique: The March for Science is a couple of months away; it's Saturday April 22. I think HacDC could be involved in setting up some events, even if just social; we should have plenty of out-of-town guest speakers that weekend. I'm also thinking of signs for the event, both the content and the materials. It'd be cool to have LED or electroluminescent signs if they can be bright enough during the day - just to start brainstorming.
- Enrique: Where is our good projector? We didn't find it for the cryptoparty. Our second-best projector is ok but aged (a bit antiquated with VGA-only, the contrast is suboptimal). If the good projector is permanently gone, should we get a new one? Yes, the previous one was generally kept locked up, by the way.
- Also Enrique: we'll be going through Signal encrypted messaging, encrypted calls and PGP encrypted email after the meeting if anyone is interested.
Director Reports
President's Report
Vice President's Report
Treasurer's Report
- Our income for January came 100% from membership dues. It was $1,330 from 30 members - 21 regular, 7 grandfathered in at $50/mo who never come around, 1 student member and 1 dues-waived member. Besides the usual rent, insurance and PayPal fees, we had two extra expenses in January: our vacuum gauge order finally went through ($611 from Project SEM) and a reimbursement to Mirage for 3D printer parts ($308 from Project Supplies). Rent rises from 993 to 1043 in February.
Secretary's Report
Director-at-Large Reports
Kevin
Matt
Adjournment
Adjourned by at xxx by xxx