Regular Member Meeting 2015 10 13: Difference between revisions
From HacDC Wiki
Line 59: | Line 59: | ||
== Member Reports == | == Member Reports == | ||
=== mirage335 === | |||
Borrowed some stuff to free up space, notably the high-power surround sound audio equipment brought-in by Shawn Nock long ago. | |||
Please keep the shelves neatly organized and functional. Especially, please keep the top shelf free of debris, it is specifically intended for lighting, networking, and audio equipment. | |||
== Old Business == | == Old Business == |
Revision as of 23:38, 9 October 2015
Time and Location
- October 13th, 2015.
- Called to order at xxxx pm by xxxx
- Members present:
- Members remote:
- Others present:
- Quorum
- Quorum met?
Approval of Previous Meeting's Minutes
Recognition
- Mirage planned out the new space layout in good detail.
- Mirage, Dan, Don and Enrique helped clean up the front basement room in preparation to move workshop equipment down there.
- Mirage built the shelves at the new space with help form Nick, Bobby and Enrique.
- Dan and Enrique went out to Community Forklift to look for building materials for the new space and basement.
- Enrique facilitated a lockpicking class attended by 17 students and 3 instructors from TOOOL.
- Julia has been keeping the space open, greeting guests and answering the phone during business hours.
- Julia has been relentlessly representing HacDC at the Columbia Heights Farmers Market weekly.
Director Reports
President's Report
Vice President's Report
Top priority is to get all our equipment back online.
Moving went surprisingly well. We still have valuable resources AND walking space. Much thanks to Don for spearheading the physical moving process. Also many thanks to those who provided feedback on the space layout.
However, our unfunded mandate to move did incur significant hidden costs. Setting aside >$1.5k for future moving services, construction, temporary/cheap storage, etc, would be wise.
Shelf screws are known to withstand ~150lbs each. Please do not approach that limitation until additional 2x4s have been added.
Treasurer's Report
Secretary's Report
- Lots of reorganization, lots of Outgoing stuff to move out, some still at my place unfortunately.
- SEM work has moved onto vacuum gauge circuitry troubleshooting.
- An Open Mapping class by Ed O. has been postponed.
- The HacDC table at the Columbia Heights Farmers Market can't be just Juri. Please come help.
- Don and Andrew were at the Silver Spring Maker Faire representing HacDC and HARC.
- Many things were put on the back burner due to the recent move: laser cutter repair, SEM refurbishment, the large-format 3D printer, resuming Microcontroller Mondays, having a Raspberry Pi meetup, making T-shirts, doing a crowdfunding campaign video, making a billboard for sponsors or putting sponsors on the homepage, scheduling a second concurrent CTF meetup, etc.
Director-at-Large Reports
Don
Phil
Project Awesome Reports
Project SUPPLIES
Project EXPANSION
Project HAMRADIO
Member Reports
mirage335
Borrowed some stuff to free up space, notably the high-power surround sound audio equipment brought-in by Shawn Nock long ago.
Please keep the shelves neatly organized and functional. Especially, please keep the top shelf free of debris, it is specifically intended for lighting, networking, and audio equipment.
Old Business
New Business
New Members
Adjournment
Adjourned by at xxx by xxx