Hacdc log 2
From HacDC Wiki
May 2, 2022 Space reopened. Small turnout, uneventful. Bobby took outgone Line 6 amp (after a 2 year delay; speaker & SEM circuit boards appear to be gone). May 30 New OS, POP! OS, installed on 3D printer computer. Most bins sorted, loose driver bits put in bottles except for hex bits - the bottle intended for those was found to still contain pills! Tabletop computers checked: 5VVYKH1 wasn't working, CPV3HF1 is missing the USB drive with the OS, & 7KDNKH1 (after it was found in an inaccessible corner) seemed to be fully updated! The other 4 are missing (anyone know where they are?). June 11 ("Spring Cleaning") Had trouble getting door unlocked. Found some stuff to consider getting rid of (i.e., CRISPR material). Took 2 Spaceblimp bins down to basement. Looked at basement - found radon monitor (Corentium) & metal saw (both Bobby's) seem to be missing (anyone know where they are?). June 13 Updated some signage. Attempt to replace incorrect CAD file on wiki crashed server. Verified 7KDNKH1 did not need updating. Created this wiki entry since trying to update the original log entry crashed the server (note pattern).