Stereoscan Operators Log: Difference between revisions

From HacDC Wiki

(adding steps for pump reconditioning)
(vacuum gauge)
Line 2: Line 2:


'''While repairing, maintaining, or using the Stereoscan S200 SEM, please add notes here. Newest at top.'''
'''While repairing, maintaining, or using the Stereoscan S200 SEM, please add notes here. Newest at top.'''
* From Tim: the red vacuum gauge sticking out of the back of the chamber is a cold cathode vacuum gauge. They're pretty reliable, but it could fail to read vacuum, indicating it needs to be cleaned. [[User:Plasma|Plasma]] ([[User talk:Plasma|talk]]) 13:07, 2 April 2014 (PDT)


* The following steps need to be performed on the Edwards roughing pump:
* The following steps need to be performed on the Edwards roughing pump:

Revision as of 20:07, 2 April 2014


While repairing, maintaining, or using the Stereoscan S200 SEM, please add notes here. Newest at top.

  • From Tim: the red vacuum gauge sticking out of the back of the chamber is a cold cathode vacuum gauge. They're pretty reliable, but it could fail to read vacuum, indicating it needs to be cleaned. Plasma (talk) 13:07, 2 April 2014 (PDT)
  • The following steps need to be performed on the Edwards roughing pump:
    • Replace the oil
    • Inspect and clean the inlet-filter
    • Clean or replace the gas-ballast filters
    • Clean the motor fan-cover
    • Test the motor condition

Refer to pg. 38 of the user instruction manual

Plasma (talk) 23:02, 1 April 2014 (PDT)

  • Use ~~~~ to automatically sign edits with username, date, and time. Mirage335 (talk) 08:21, 1 April 2014 (PDT)
  • March 31st: Cleaned the plinth and took photographs of the vacuum components. Available here. -Dan K.
  • Oil diffusionTurbo molecular pump was hanging due to the lip falling out of the rubber suspension. Could be cleaned and probably popped back in.
  • Broken switch on roughing pump was bypassed internally. Plugging in the outlet should activate the pump. (This pump normally runs 24/7 when the machine is operational.)
  • Compressed air needed to get more dust out
  • March 30th: Moving complete! The SEM is now in the workshop
  • March 29th: Awaiting pick-up and installation (March 29th and 30th).