* Compressed air needed to get more dust out
* Compressed air needed to get more dust out


March 30th: Moving complete! The SEM is now in the workshop
* March 30th: Moving complete! The SEM is now in the workshop


March 29th: Awaiting pick-up and installation (March 29th and 30th).
* March 29th: Awaiting pick-up and installation (March 29th and 30th).


March 23rd: A space in the workshop has been cleared. Photo: http://i.imgur.com/BDNWL5z.jpg
* March 23rd: A space in the workshop has been cleared. Photo: http://i.imgur.com/BDNWL5z.jpg

Revision as of 15:21, 1 April 2014


While repairing, maintaining, or using the Stereoscan S200 SEM, please add notes here. Newest at top.

  • Use ~~~~ to automatically sign edits with username, date, and time.
  • March 31st: Cleaned the plinth and took photographs of the vacuum components. Available here. -Dan K.
  • Oil diffusionTurbo molecular pump was hanging due to the lip falling out of the rubber suspension. Could be cleaned and probably popped back in.
  • Broken switch on roughing pump was bypassed internally. Plugging in the outlet should activate the pump. (This pump normally runs 24/7 when the machine is operational.)
  • Compressed air needed to get more dust out
  • March 30th: Moving complete! The SEM is now in the workshop
  • March 29th: Awaiting pick-up and installation (March 29th and 30th).