HacDC Spaceblimp 3: Difference between revisions
From HacDC Wiki
No edit summary |
(new date) |
||
Line 1: | Line 1: | ||
'''PLEASE NOTE - NEW DATE! | |||
''' | |||
Planned launch date: Saturday, November | Radio check and meet for logistics planning: Monday Nov 8, 7:00 PM at HacDC | ||
Planned launch date: Saturday, November 13, 2010 (Rain date November 14). | |||
Launch time: 9:00 AM, Launch should take less than an hour. | Launch time: 9:00 AM, Launch should take less than an hour. |
Revision as of 18:27, 2 November 2010
PLEASE NOTE - NEW DATE!
Radio check and meet for logistics planning: Monday Nov 8, 7:00 PM at HacDC
Planned launch date: Saturday, November 13, 2010 (Rain date November 14).
Launch time: 9:00 AM, Launch should take less than an hour.
Launch Location: Probably along US 81 Between Hagerstown, MD and Edinburg, VA. Specific location, directions and coordinates will be posted on HacDC.org by 7:00 AM day of event.
Coordination/Talk-in: 146.685 MHz repeater input, 146.415 MHz simplex
Planned Altitude: TBD
Planned Ascent Rate: TBD
Primary Beacon: Tiny Track 4 with 0.5 W transmitter on 144.390 MHz, call sign W3HAC-11. $3 GPS module
Secondary Beacon: Son-of-WhereAVR with ublox GPS. Yaesu VX-1 handi-talkie with 1 W Transmitter, call sign WE3HAC-12, Frequency TBD
Recording accelerometer, air pressure based altimiter, cosmic ray counter
Stay tuned for details!
If you want to get involved or learn more or contribute to the program...
Subscribe to the Spaceblimp email list http://hacdc.org/mailman/listinfo/spaceblimp
Help Wanted:
blog about upcoming flight, document SB-1 on wiki
build primary & secondary beacon antenna
altimeter selection & purchase
purchase 32 GB SDHC memory card for video build battery pack for video
make weatherproof labels/tags for capsule recovery (laminate, 3d print, laser cut, etc.)
work on CHDK scrips for still cameras
build capsule/rigging/chute
vacuum test Geiger counter
new software for additional sensors (add small uC?)
[email protected] |
Subscribe to the Spaceblimp email list |