Actions

Stereoscan Operators Log: Difference between revisions

From HacDC Wiki

No edit summary
No edit summary
Line 3: Line 3:
'''While repairing, maintaining, or using the Stereoscan S200 SEM, please add notes here. Newest at top.'''
'''While repairing, maintaining, or using the Stereoscan S200 SEM, please add notes here. Newest at top.'''


* Use <nowiki>~~~~</nowiki> to automatically sign edits with username, date, and time.
* Use <nowiki>~~~~</nowiki> to automatically sign edits with username, date, and time. [[User:Mirage335|Mirage335]] ([[User talk:Mirage335|talk]]) 08:21, 1 April 2014 (PDT)


* March 31st: Cleaned the plinth and took photographs of the vacuum components. [https://dl.dropboxusercontent.com/u/45972/sem/sem_cleaning/index.html Available here]. -Dan K.
* March 31st: Cleaned the plinth and took photographs of the vacuum components. [https://dl.dropboxusercontent.com/u/45972/sem/sem_cleaning/index.html Available here]. -Dan K.

Revision as of 15:21, 1 April 2014


While repairing, maintaining, or using the Stereoscan S200 SEM, please add notes here. Newest at top.

  • Use ~~~~ to automatically sign edits with username, date, and time. Mirage335 (talk) 08:21, 1 April 2014 (PDT)
  • March 31st: Cleaned the plinth and took photographs of the vacuum components. Available here. -Dan K.
  • Oil diffusionTurbo molecular pump was hanging due to the lip falling out of the rubber suspension. Could be cleaned and probably popped back in.
  • Broken switch on roughing pump was bypassed internally. Plugging in the outlet should activate the pump. (This pump normally runs 24/7 when the machine is operational.)
  • Compressed air needed to get more dust out
  • March 30th: Moving complete! The SEM is now in the workshop
  • March 29th: Awaiting pick-up and installation (March 29th and 30th).