Meatup Nov 8 2012: Difference between revisions
From HacDC Wiki
No edit summary |
No edit summary |
||
Line 28: | Line 28: | ||
==Shawn== | ==Shawn== | ||
Do a better checkout / postmortem on the v4 at home with familiar meters and scope. | Do a better checkout / postmortem on the v4 at home with familiar meters and scope. | ||
[[Category:Meatups]] |
Latest revision as of 21:33, 13 November 2012
Where and when
Thursday November 8th, 2012; 1930 @ HacDC
Attendance
New Business
None
Build / Test OpenTDCS v4
Shawn has received three (3) v4 PCBs from fabrication. The plan is to build at least one and have a look on the Oscilloscope.
A single prototype was built. The output looked sensical, but the current limiting functions didn't appear to be calibrated to the expected values. Shawn only spent a few minutes with the multimeter / scope.
Old Business
Project Updates
Wiki
Many pages added
Physiological Saline
No progress
Pacemaker
Initial Spice modeling of silly 555 circuits underway.
Homework
Shawn
Do a better checkout / postmortem on the v4 at home with familiar meters and scope.