Actions

Regular Member Meeting 2008 12 09: Difference between revisions

From HacDC Wiki

No edit summary
Line 35: Line 35:


=== [[Workshop Configuration]] ===
=== [[Workshop Configuration]] ===
[[User:Myself|Nate]] reports there's no power or light right now, but it's getting cleaned up; we will be adding outlets and shelving. Member 28 suggests a small area near the door be a donations pile / input buffer; general consensus that people bringing stuff and it not being dealt with is a continuing problem for us, and we want to avoid this.
We have two dust extractors that should go in the workshop.  Noise dampening may be something we want to look into—the welding blanket and stuff stored on the shelves may dampen somewhat; general consensus that safety equipment will be a high priority.  Member 28 suggests that in addition to painting we should wrap using 10 mil sheeting.
Water is entering the space, and we'll want to figure out exactly how and control that.
An air conditioner would help control the humidity and make it comfortable in the summer.
We can expect to be looking at shelving by this weekend.


=== [[Main Space Reconfiguration]] ===
=== [[Main Space Reconfiguration]] ===


== New Business ==
== New Business ==

Revision as of 06:03, 10 December 2008

Time & Location

December 9, 2008
Members Present: Nick, Nate, Member 28, Eoin, Martin, Katie, Elliot, Tim C., Anonymous Member
Others Present: Sean (prospective new member)
Quorum: Yes
19:40ish to 20:20
HacDC, 1525 Newton St NW, Washington, DC. (Space)
Presiding: Elliot

Draft minutes of the last meeting

Regular Member Meeting Minutes 2008 12 02 were reviewed and unanimously ratified.

The Consent Agenda

(no items)

Minister Reports

Coordinator in Chief: Nothing to report.

Minister of Finance: "We have money."

Minister of Information: Nothing to report.

Keeper of the MIBS: Not Present.

Member Reports

Nate reported that it's awesome to be back in town. Anonymous Member reported on the status of Project Red Phone, which is coming along; a class or seminar on Asterisk will be held at some point in the next few months.

Old Business

Workshop Configuration

Nate reports there's no power or light right now, but it's getting cleaned up; we will be adding outlets and shelving. Member 28 suggests a small area near the door be a donations pile / input buffer; general consensus that people bringing stuff and it not being dealt with is a continuing problem for us, and we want to avoid this.

We have two dust extractors that should go in the workshop. Noise dampening may be something we want to look into—the welding blanket and stuff stored on the shelves may dampen somewhat; general consensus that safety equipment will be a high priority. Member 28 suggests that in addition to painting we should wrap using 10 mil sheeting.

Water is entering the space, and we'll want to figure out exactly how and control that.

An air conditioner would help control the humidity and make it comfortable in the summer.

We can expect to be looking at shelving by this weekend.

Main Space Reconfiguration

New Business